Rehabilitate and Paint Tainter Gates – Murray Lock + Dam and Toad Suck Lock and Dam

Work included visual Hydraulic Steel Structure (HSS) inspection, steel repair/welding (per AWS D1.1M/D1.1), corrosion repair, abrasive blasting, lead-based paint removal over and on water, cathodic protection removal and installation. SSPC QP1/QP2 certification was required. Abrasive blast cleaned 30 tainter gates to a SSPC SP-5 and applied multiple coating systems to the tainter gates that included 5-E-Z Vinyl.

Tags: Dams & Hydropower Experts
QP1 & QP1 Certified Contractor

The Gold Standard – Industrial Coatings Industry Certification (QP1 and QP2)

Paragon is the only Louisiana-based AMPP (SSPC) QP1 and QP2 certified contractor.

  • Management of hazardous paint removal projects
  • Technical capabilities related to hazardous paint removal
  • Personnel qualifications and training
  • Safety and environmental compliance programs

 

Our third-party painting certifications, along with a 20-year track record of successfully completing projects within budget and ahead of schedule demonstrates our commitment to providing a quality service.

Paragon Construction, Louisiana

Lets Get Started

Have a question? Send us a message or call our infrastructure maintenance experts at our New Orleans Office (504) 224-9249. Learn how we can assist you on your next rehabilitation project.

Contact Us

1070-B West Causeway Approach
Mandeville, LA 70471

e: info@pcsoa.com
t: (504) 224-9249

Hours of Operation

Mon - Fri 7:30 - 5:30
Closed Sat & Sun

Our Markets

  • Bridges
  • Dams
  • Industrial
  • Water
  • Rail

Stay Connected

Share This Post: